Archive for the ‘Materials and Resources’ Category
Tuesday, February 12th, 2008
Intent:
Encourage forest management program.
Implementation:
Use minimum of 50% of wood materials and products certified in accordance with FSC (Forest Stewardship Council) Principles and Criteria for wood building components:
framing
flooring and sub-flooring
wood doors
etc.
Based on Cost of FSC wood products compared to total wood material cost.
Exclude MEP and elevator equipment
Furniture is okay to ...
Posted in Materials and Resources | 11 Comments »
Tuesday, February 12th, 2008
Intent:
Reduce use of "long cycle" and finite raw materials.
Implementation:
Use rapidly renewable materials and products for 2.5% of total value of all building materials and products used (based on cost)
harvested within a 10-year cycle or shorter
consider:
bamboo flooring
wool
cotton insulation
cork flooring
linoleum flooring
wheat board cabinets
straw board
agrifiber
Code:
none
Submittal Phase:
construction
Extra Credit:
use 5% instead of 2.5% for ...
Posted in Materials and Resources | 12 Comments »
Tuesday, February 12th, 2008
20% Extracted, Processed & Manufacturer Regionally Intent:
Increase demand for building materials and products that are extracted and manufactured within the region. This supports indigenous resources and reduced environmental impacts from transportation.
Implementation:
Use materials that have been extracted, harvested, recovered or manufactured within 500 miles of the site
Minimum 20% (based on ...
Posted in Materials and Resources | No Comments »
Tuesday, February 12th, 2008
10% Extracted, Processed & Manufacturer Regionally Intent:
Increase demand for building materials and products that are extracted and manufactured within the region. This supports indigenous resources and reduced environmental impacts from transportation.
Implementation:
Use materials that have been extracted, harvested, recovered or manufactured within 500 miles of the site
Minimum 10% (based on ...
Posted in Materials and Resources | 10 Comments »
Sunday, February 3rd, 2008
Same as credit MR 4.1, except for percentage of total construction material from recycled items (10% in Materials and Resources 4.1)
20% of Total Construction Material from Recycled Items (post consumer + 1/2 pre-consumer)
Intention:
Reduce impact from extraction and processing of virgin materials
Increase use of recycled content in building
Implementation:
There are two types ...
Posted in Materials and Resources | 10 Comments »
Sunday, February 3rd, 2008
Same as credit MR 4.2, except for percentage of total construction material from recycled items (20% in Materials and Resources 4.2)
10% of Total Construction Material from Recycled Items (post consumer + 1/2 pre-consumer)
Intention:
Reduce impact from extraction and processing of virgin materials
Increase use of recycled content in building
Implementation:
There are two types ...
Posted in Materials and Resources | 7 Comments »
Saturday, February 2nd, 2008
Same as credit MR 3.1 , except for percentage of total construction material is reused items (5% in Materials and Resources 3.1)
10% of Total Construction Material is from reused items
Intention:
Reduce waste
Reduce processing of virgin resources and materials
Implementation:
Definition of Reuse: bring back to original capacity & reduce use ...
Posted in Materials and Resources | No Comments »
Saturday, February 2nd, 2008
Same as credit MR 3.2 , except for percentage of total construction material is reused items (10% in Materials and Resources 3.2)
5% of Total Construction Material is from reused items
Intention:
Reduce waste
Reduce processing of virgin resources and materials
Implementation:
Definition of Reuse: bring back to original capacity & reduce use ...
Posted in Materials and Resources | 6 Comments »
Saturday, February 2nd, 2008
Same as credit MR 2.1, except for percentage diverted (50% in Materials and Resources 2.1)
Divert 75%
Intention:
Divert construction and demolition debris from landfills and incinerators
Redirect recyclables back to manufacturing process
Redirect reusable materials to appropriate sites
Implementation:
Develop a construction waste management plan to at a minimum, identify materials to be diverted:
salvage, refurbish, recycle, ...
Posted in Materials and Resources | 4 Comments »
Saturday, February 2nd, 2008
Same as credit MR 2.2, except for percentage diverted (75% in Materials and Resources 2.2)
Divert 50%
Intention:
Divert construction and demolition debris from landfills and incinerators
Redirect recyclables back to manufacturing process
Redirect reusable materials to appropriate sites
Implementation:
Develop a construction waste management plan to at a minimum, identify materials to be diverted:
salvage, refurbish, recycle, ...
Posted in Materials and Resources | 12 Comments »