Archive for the ‘Prerequisites’ Category

Energy and Atmosphere P3 - Fundamental Refrigerant Management (prerequisite)

Tuesday, February 12th, 2008

Intent: Reduce ozone depletion. Implementation: New Building: Zero use of CFC-based refrigerants in HVAC systems Existing Building: Consider replacement or "phase-out" program for HVAC units and fire systems with CFCs. CFC production stopped in 1995 and was phased out 5 years after that. Existing mechanical systems connected to existing chilled water systems have to be CFC-free. notes: ODP: ...

Energy and Atmosphere P2 - Minimum Energy Performance (prerequisite)

Tuesday, February 12th, 2008

Intent: Establish minimum level of energy efficiency for building system. Implementation: option 1: Building envelope and system to comply with ASHRAE / IESNA 90.1-2004 Sections 5 - 10 Comply with prescriptive requirements of ASHRAE, 90.1-2004 option 2: comply with local codes or DOE (Department of Energy), instead of ASHRAE mandatory: provide occupancy controls for: class rooms meeting rooms break rooms Code: ASHRAE ...

Energy and Atmosphere P1 - Fundamental Commissioning of the Building Energy Systems (prerequisite)

Tuesday, February 12th, 2008

Intent: Verify that building's energy related systems are installed, calibrated, and perform accord to BOD (Basis of Design), OPR (Owner's Project Requirements), and Construction Documents. Implementation: (UPDATED!) Designate a Commissioning Authority (CxA) to lead, review, and oversee completion of commissioning process Must be experienced for two similar projects independent person for projects less that 50,000 ...

Indoor Environmental Air Quality P2 - Environmental Tobacco Smoke (ETS) Control (prerequisite)

Wednesday, February 6th, 2008

Intent:  Minimize exposure of building occupants, indoor surfaces, and ventilation systems to ETS (Environmental Tobacco Smoke). Implementation: Option 1: Prohibit Smoking  no smoking except outdoors at least 25'-0" from: entries outside air intakes operable windows Option 2: Designated Areas no smoking except in designated area and outdoor (same rules as previous for outdoor) Designated smoke rooms to: effectively capture, contain and ...

Indoor Environmental Air Quality P1 - Minimum Indoor Air Quality (IAQ) Performance (prerequisite)

Wednesday, February 6th, 2008

1st of 2 prerequisites in Indoor Environmental Air Quality (EQ for short) Intent: to establish minimum IAQ performance to enhance indoor air quality in buildings contribute to the well-being of the occupants Implementation: Meet minimum requirement of Sections 4 thru 7 of ASHRAE 62.1-2004: Ventilation for Acceptable Indoor Air Quality  Mechanical Ventilation Systems: designed using Ventilation ...

Materials and Resources P1 - Storage & Collection of Recyclables (prerequisite)

Thursday, January 31st, 2008

Intention: Reduce waste from building occupants Reduce waste going to landfills Provide accessible storage and collection locations on site Implementation: Methods of Approach: separation collection storage Collection Sources: recycle chutes collection bins can crushers cardboard balers Materials Collected: glass paper metal plastic cardboards provide instruction to occupants encourage activities to encourage recycling and less use of solid waste provide for minimum recycling area (rough guidelines just for your information): 0-5000 SF commercial building: ...

Sustainable Sites P1 - Construction Activity Pollution Prevention (prerequisite)

Sunday, January 20th, 2008

This is a prerequisite credit. Prerequisite credits are mandatory credits that MUST be accomplished for a building to become LEED certified. There are 7 overall prerequisites in the New Construction version 2.2 LEED-AP reference guide which is the exam version this study guide covers. Construction Activity Pollution Prevention is the ...