Intent:
Encourage development and use of grid-source renewable energy technologies for NET ZERO pollution basis.
Implementation:
TYPES OF RENEWABLE ENERGY (as defined by the CRS - Center for Resource Solutions):
Solar
Photo-voltaic
Wind
Geothermal heating and electric
Biomass
Bio-gas
Low-Impact Hydro Electric
determine BASELINE electricity use from:
consumption based on EA1 - Optimize Energy Performance
use DOE (Department of Energy) CBECS (Commercial Building ...
Posted in Energy and Atmosphere | 4 Comments »
Wednesday, February 13th, 2008
Intent:
Provide for the ongoing accountability of building energy consumption over time. Basically, develop a plan to measure and check the building's energy consumption.
Implementation:
sidenote: there are 4 options, but for LEED we only look at 2, B and D.
Develop and implement a Measurement and Verification (M&V) Plan consistent with:
OPTION B (smaller ...
Posted in Energy and Atmosphere | 7 Comments »
Wednesday, February 13th, 2008
Intent:
Reduce ozone depletion potential (ODP) and global warming potential (GWP)
Support early compliance with EPA Montreal Protocol
Implmentation:
Quick Information:
refrigerant comparison
CFC (high)
HCFC (medium)
HFC (low)
efficiency of HFC is less than HCFC
OPTION 1: do not use ANY refrigerants
OPTION 2: use refrigerants and HVAC that minimizes or eliminates emission of compounds that cause ozone depletion & ...
Posted in Energy and Atmosphere | 8 Comments »
Wednesday, February 13th, 2008
Intent:
To begin commissioning process early during design process
Execute additional activities after systems performance verification is completed
Implementation:
In addition to prerequisite commissioning (EAp1):
designate CxA (commissioning authority) to lead/review/oversee completion of all commissioning process activities
CxA must REVIEW OPR (Owner's Project's Requirements), BOD (Basis of Design), and Design Documents prior to 50% CD.
CxA shall ...
Posted in Energy and Atmosphere | 3 Comments »
Wednesday, February 13th, 2008
Intent: Increase on-site renewable energy self supply Reduce environmental and economic impacts associated with fossil fuel use Offset building energy costsImplementation: ELIGIBLE TYPES OF RENEWABLE ENERGY: Solar Photo-voltaic Wind Geothermal heating and electric Biomass Bio-gas Low-Impact Hydro Electric NON-ELIGIBLE TYPES OF RENEWABLE ENERGY: Architectural features Passive solar daylighting geo-exchange (ground source heat pumps) green-power from off site To gain points: achieve savings in building annual energy savings cost 2.5% ...
Posted in Energy and Atmosphere | 7 Comments »
Wednesday, February 13th, 2008
Intent:
Achieve increasing levels of energy performance above the baseline in the prerequisite.
Reduce environmental and economic impacts associated with building energy usage.
Implementation:
Methods of optimizing energy performance:
Reduce building footprint
Reduce demand
Provide sensors in:
for break rooms
class rooms
meeting/conference rooms
Harvest Energy
Building Orientation
Window Location
Natural Ventilation
Improve Efficiency
through ...
Posted in Energy and Atmosphere | 33 Comments »
Tuesday, February 12th, 2008
Intent:
Reduce ozone depletion.
Implementation:
New Building: Zero use of CFC-based refrigerants in HVAC systems
Existing Building: Consider replacement or "phase-out" program for HVAC units and fire systems with CFCs.
CFC production stopped in 1995 and was phased out 5 years after that.
Existing mechanical systems connected to existing chilled water systems have to be CFC-free.
notes:
ODP: ...
Posted in Energy and Atmosphere, Prerequisites | 10 Comments »
Tuesday, February 12th, 2008
Intent:
Establish minimum level of energy efficiency for building system.
Implementation:
option 1:
Building envelope and system to comply with ASHRAE / IESNA 90.1-2004 Sections 5 - 10
Comply with prescriptive requirements of ASHRAE, 90.1-2004
option 2:
comply with local codes or DOE (Department of Energy), instead of ASHRAE
mandatory: provide occupancy controls for:
class rooms
meeting rooms
break rooms
Code:
ASHRAE ...
Posted in Energy and Atmosphere, Prerequisites | 3 Comments »
Tuesday, February 12th, 2008
Intent:
Verify that building's energy related systems are installed, calibrated, and perform accord to BOD (Basis of Design), OPR (Owner's Project Requirements), and Construction Documents.
Implementation: (UPDATED!)
Designate a Commissioning Authority (CxA) to lead, review, and oversee completion of commissioning process
Must be experienced for two similar projects
independent person
for projects less that 50,000 ...
Posted in Energy and Atmosphere, Prerequisites | 12 Comments »